Artistic Accounting Weeks 13-16

I have gotten some stuff done over the intervening weeks. Built the 1st round of Tetri boxes. And the Stackable Storage that goes inside. the stackable are working perfectly. there is some tweaking that needs to happen on the Tetri. Some of the Finger joints don’t align perfectly. And on one box, I have them incorrectly placed. I also have to tweak the clearance on the doors.

I was able to finish a 2nd chair and more importantly my new desk. A couple of coats of Spar Urethane later and it was good to go. It has a nice look to it. Yesterday was able to start placing the cables, printer and Drobo.

The office will be a lot better once I get more Stackables made and can put away more stuff forte other horizontal surfaces.