What’s the Watt

Somehow, We seem to have saved $20 on our electricity bill last month. Since our heat and hot water are both from natural gas it is not changing due to weather/heating needs.(mental note haven’t put insulation on Hot water heater). So I think it is based on our usage. There are three things that have changed that might be it.

Changing to fluorescent bulbs. We put fluorescent bulbs in the lights we use the most (kitchen, dining room and bathroom). They consume a lot less electricity, like 14W instead of 60-75W, and now are instant on. So instead of flickering when they first go on, they turn on right away. Although they start off a little dim and take a couple minutes to get up to full intensity.

Turning off the entertainment center. Our TV, stereo, DVD player, VCR are all in a power strip. Whenever it is not in use we just turn it off. Any thing that uses a remote consumes power when not in use( waiting for the IR signal from the remote). So this saves power for the 22-23 hours they are not in use each day.

Turning off lights when we are not in the room. I am making a concerted effort to turn off lights when there is no one in the room.

I can’t think of what else has changed, but those seems like they have significantly helped our electric bill. I am afraid to think of the electric bill at work, with the smallest stage light consuming 500W and the largest using up 2000Watts. Luckily I don’t pay those bills.

In the thick of things

Currently I’m in the first dress for Oscar & Felix. Sometimes I can’t wait for a show to open because I’m excited to get an audience in. And sometimes I just want the show to be open and done with. This is the Latter. I’ve decided being the Scene designer/Lighting designer/Technical Director isn’t all it’s cracked up to be. Mainly because I think the design has suffered. Some interesting things can happen when elements are designed at the same time. However, there is too much overlap and not enough people. As a result we are a little behind with both the sets and lights.

I’ll have time for more later…

We are busy

An actual exchange between Ann and I:

Ann: I got an email from Shenanarts. They’re doing Seussical.

Me: (trying to remember) Didn’t we vow to never work there again?

A: Yeah. But… it’s June 7th. we could get some extra money for the trip to Europe.

O: I’m doing Kiss Me Kate the end of May. When is their tech?

A: The following week. Oh I’m lighting that dance recital then.

O: Since I’m in tech the end of May, you couldn’t just design it early.

A: I guess we’re keeping our vow.

New address, same old house

I have now changed the web address of the blog. Instead of :http://www.courtneycollinsstudio.com/blog. It is now http://eclectica.courtneycollinsstudio.com/.

Update your RSS reader/bookmarks.

I have tried to redirect the the page as well as the feed. if there are problems let me know. Of course if there are problems you might not have gotten to this page. Hmm….

Lego fun

I’ve started playing around with the Legos that Jon sent for Christmas(yes I make sure the kids get to play with them) I have started a lego version of the Thomas Jefferson Polygraph machine. It is a mechanical device to copy your writing as your are writing. ( think I could have said that better) The original can be viewed here. It is from the Monticello website.
I’ll post a picture when I get it finished. It’s a nice diversion from all the work I bring home.

the Blog of Owen Collins